Parameter sweep / sensitivity analysis report

Single-case simulation is possible, but there is no batch parameter sweep and no consolidated multi-scheme comparison document.

Wired, not run yetP2All reportsComputing…
Wiring check (verbatim, from the engine source)Wired (specification switch name matches the engine)
PriorityP2
Switch named by the specificationstudyOptions.enableParamScan
Wired verbatim in the engine?yes(3 evidence)
Engine switches that actually produce this reportenableParamScan
Report chapters these switches can appendparametric-scan
Built-in chapter list (from the specification)The specification asks for 8 chapter(s); the engine can produce 1 of them for this report.
Standards basisParametric energy-system studies; DOE design-of-experiments engineering practice.
The specification switch `studyOptions.enableParamScan` is wired verbatim (`engines/parametric-scan.js`, chapter `parametric-scan`).

evidence · file:line

Wiring check (verbatim, from the engine source) · evidence
  • [Wired verbatim in the engine?] engines/parametric-scan.js:107 · const SWITCH_MAIN = 'enableParamScan';
  • [Wired verbatim in the engine?] engines/parametric-scan.js:110 · 'enableParamScan', // ← 主名(清单字面 studyOptions.enableParamScan)
  • [Wired verbatim in the engine?] design.js:2164 · * 开关主名 studyOptions.enableParamScan(别名由引擎 PARAMSCAN.resolveParametricScan 统一解析)。
  • enableParamScan
    • engines/parametric-scan.js:107 · const SWITCH_MAIN = 'enableParamScan';
    • engines/parametric-scan.js:110 · 'enableParamScan', // ← 主名(清单字面 studyOptions.enableParamScan)
    • design.js:2164 · * 开关主名 studyOptions.enableParamScan(别名由引擎 PARAMSCAN.resolveParametricScan 统一解析)。
Built-in chapter list (from the specification)8 chapter(s)
  1. 1.Report overview: sweep objective, parameter ranges and step sizes, simulated cases, model assumptions.
  2. 2.Sweep parameter list: transformer capacity, cable cross-section, PV installed capacity, battery capacity and other variables.
  3. 3.Batch simulation result table: power flow, short-circuit, power-quality and economic indicators for each parameter set.
  4. 4.Indicator comparison summary: voltage-limit violation probability, overload conditions, LCC / NPV trend against the parameters.
  5. 5.Two-dimensional heat map to identify indicator trends against the parameters.
  6. 6.Feasible-scheme screening: parameter combinations that satisfy all electrical constraints.
  7. 7.Conclusions: recommended parameter ranges, sensitive parameters identified, design-boundary recommendations.
  8. 8.Appendix: sweep settings, all raw simulation results.
Chapters produced by the engine for this scheme0 / 1

This report has not been run for the current scheme yet.

Nothing is invented: run it, or enable the switches on the relevant tool pages, and the produced chapters appear here.
Conclusions produced for this report0

No conclusion of this report was produced (the report has not been run, or it produced none).

Charts
Required by the specification
  • Parameter heat map
  • Indicator versus parameter curves
  • Feasible-scheme scatter chart
Produced by the engine (report-charts study)

This report has not been run for the current scheme yet.

Explicitly out of scope (from the specification)4
  • · Grid traversal sweep only — not intelligent optimisation.
  • · No global multi-objective Pareto optimisation.
  • · No higher-order probabilistic effects from strong inter-parameter coupling.
  • · For scheme screening only; it does not output a final optimum design automatically.

Sends one design request with exactly the switches below enabled. Nothing is calculated when the page opens.